Nice Factory For Rent in Dong Nai, Vietnam
This is the caption of image number 1
We are Professional Leasing Real Estate Service in Hochiminh city, especially in
Villa for Rent/Lease; House For Rent/Lease; Apartment For Rent/Lease; Factory for
Rent/Lease; Warehouse Rent/Lease; Factory or Warehouse For Sale/buying in Hochiminh
city, HCMC in Vietnam
TOTAL AREA
|
- Total area of workshops : 222,000 m2
- The land area of a workshop : upon its location
- A workshop includes : production area, office, infrastructure (motorcycle shed, guardhouse, green area, internal road,…) (specification attached)
* Area of office (2 floors): 36 m x 8 m x 2 = 576 m2 (if any)
* Area of production :
+ Type 1: 36m x 72 m = 2,592 m2
+ Type 2: 36 m x 64 m = 2,304 m2
+ Type 3: 36 m x 56 m = 2,016 m2
+ Type 4: (36 m x 48 m) + (18 m x 8 m) = 1,872 m2
|
RENTAL &
TERM OF PAYMENT
|
1. Rental: US$ .... /m2/month (exclude VAT)
(for workshop area)
2. Management fee : US$ 1 / m2/ year (exclude VAT )
(for land area)
3. Deposit: equal to 6-month rental
4. Payment methods: paid quarterly, at the first month of each quarter of every year.
5. Minimum Leasing Period: 5 years
|
LOCATION
|
(1) Roads:
- 15 km from Bien Hoa City
- 35 km from Ho Chi Minh City by National Highway No. 52 and No. 51.
- 20 km from Ho Chi Minh City by Highway HCM City - Long Thanh - Dau Giay (expected in 2012)
- 2 km to Ho Chi Minh-Long Thanh-Dau Giay (expected in 2012)
(2) Water Ports:
- 35 km to Phu My Deep Water Port
- 75 km to Vung Tau Sea Port
- 23 km to Go dau IZ Port
- 35 km to Cai Mep, Thi Vai
(3) Railways:
- 15 km to Bien Hoa Railway Station
- 30 km to Song Than Railway Station
(4) Airports:
- 45 km to Tan Son Nhat Airport
- 11 km to New International Airport
|
THE PROCEDURE OF INVESTMENT IN LONGTHANH IZ
(LEASE WORKSHOPS)
1. The investor fills in and signs the Registration of lease workshop in Long Thanh IZ, Sonadezi Long Thanh will reserve the lease workshop for the investor within 14 (fourteen) days from the signing date of the Registration.
2. The investor signs the Workshop Lease Agreement and pay a deposit, equivalent to an amount of the workshop rental of 6 (six) months, within 10 days after the signing date of the agreement. Sonadezi Long Thanh will reserve the lease workshop for the investor within 45 (fourteen) days from the signing date of the Registration
3. The investor has 45 days to prepare, apply and get an investment license.
- The time to prepare the application is about 10 days.
- The time to get investment license is about 15 days after Dong Nai Industrial Zone Authority has received all needed documents from the investor.
- Right after getting investment license, the investor implements next procedures to sign the Land Subleased Contract:
o Making the company seal
o Register the Board of Manager
o Register Tax code.
4. The investor has to sign the ‘Workshop Lease Contract’ within 30 days from the issuing date of the new investment license.
5. The term of payment :
5.1. The Workshop Rental is paid quarterly, at the latest on 30 of the first month every quarter in a year.
For the first quarter, the Workshop rental must be paid within 10 (ten) days from the signing date of the Workshop Lease Contract.
5.2. The Management fee is paid annually, at the latest on January 31st of every year.
For the first year: the Management Fee is paid within 10 (ten) days from the signing date of the Workshop Lease Contract.
6. The other procedures after getting the investment license are:
6.1. Open bank accounts in Vietnam...
6.2. Register company Tax code.
6.3. Announce company establishment in newspapers.
6.4. Register import & export license.
6.5. Environment Impact Report.
SPECIFICATION
|
OFFICE BUILDING
|
|
Conditioner system
|
Ventilation fans and air conditioners
|
Lighting system
|
Fluorescent lamps, emergency lights, exit lights
|
Electrical system
|
Distribution cabinet, switches and sockets.
|
Telephone system
|
LAN (local area network) and sockets
|
Fire protection system
|
Smoke detector, emergency switch, fire alarm, fire cabinet
|
OTHER ITEMS
|
|
Foundation
|
Reinforced concrete (R/C) foundation, ceramic tiles
|
Floor
|
R/C floor with ceramic tile, loading capacity of 0.2 T/m2
|
The door/window
|
Aluminum frame
|
Elevation
|
R/C structure, 1.4 m wide, wood handrail
|
Ceiling
|
Gypsum board, aluminum frame (ground floor and first floor)
|
Roof
|
Insulating colorful stainless steel
|
Insulation
|
Polynum
|
Structure
|
R/C frame
|
The wall
|
Emulsion paint, trowel
|
Sanitary system
|
Fully installed
|
PRODUCTION FACTORY
|
|
Lighting system
|
Incandescent lamps
|
Electrical system
|
Distribution cabinet
|
Fire protection system
|
Fire cabinet
|
Lightning-rod
|
Fully installed
|
OTHER ITEMS
|
|
Foundation
|
Reinforced concrete (R/C), loading capacity of 1.5 T/m2, hardener
|
The door/window
|
Aluminum/iron frame
|
The roller door
|
Size of 4m x 5m
|
Balcony & stairs from the first floor office down the production factory
|
R/C balcony, steel elevation, 1.0 (one) meter width, steel handrail
|
Roof
|
colorful stainless steel
|
Height
|
Column : 7 m;
Ridge : 11 m
|
Insulation
|
Polynum
|
Structure
|
R/C & steel frame
|
The wall
|
200 - mm brick (trowel, emulsion paint), colorful stainless steel partition
|
Sanitary system
|
Fully installed
|
GUARD HOUSE
|
|
Area
|
12 m2
|
Conditioner system
|
Ventilation fan
|
Lighting system
|
Fluorescent lamps
|
Electrical system
|
Distribution cabinet, switches and sockets
|
Telephone system
|
Sockets
|
OTHER ITEMS
|
|
Foundation
|
Reinforced concrete (R/C), ceramic tiles
|
The door/window
|
Aluminum frame
|
Ceiling
|
Gypsum board ceiling with aluminum frame
|
Structure
|
R/C structure
|
The wall
|
200 - mm brick (trowel, emulsion paint)
|
Sanitary system
|
Fully installed
|
GATE
|
8 m in width with electric motor
|
MOTORCYCLE SHED
|
|
Area
|
92 m2
|
Lighting system
|
Fluorescent lamp
|
Height
|
2.5 m
|
PUMP STATION FOR FIRE
|
|
Underground tank
|
R/C structure, volume of 100 m3
|
Diesel pump
|
54 m3/h, fully installed
|
electrical pump
|
54 m3/h, fully installed
|
Electrical system
|
Distribution cabinet
|
TRANSFORMER STATION
|
|
Transformer
|
As requirement
|
Electrical system
|
Distribution cabinet
|
OUTSIDE AREA
|
|
Lighting system
|
|
Fire protection system
|
Fire cabinet, water supply poles,
|
Storm drainage system
|
Connected to storm drainage system in Long Thanh IZ
|
Wastewater drainage system
|
Connected to wastewater drainage system in Long Thanh IZ
|
Road
|
Capacity of H30, 4m in width
|
Flagpole
|
Stainless steel pole, 10 m in height
|
Fence
|
2m in height, open fence or close fence depend on the location of land
|
Company name
|
Granite
|
Green
|
Around the factory
|
Toilet for workers
|
About 40 m2, fully installed
|
Other Related Properties
Located in Duc Hoa Industrial Park in Duc Hoa district, Long An province, only 28 km to Hochiminh city and 20km to Tan San Nhat airport. This is nice & new
...
See more
Located in My Phuoc Industrial Park, Binh Duong province, 40 kilo meters to Saigon Bridge. This is nice & new factory inside industrial park, only 01 level, the total area
...
See more
Large showroom& warehouse for lease in Thuan An ward, BInh Duong province, 25 minutes to Hochiminh city near Vietnam Singapore Industrial Park. Right on the main road, truck can
...
See more
Located in Lai Uyen ward in Ben Cat District, Binh Duong province, 65 kilo meters to Saigon Bridge.The total area is around 20.000sq.m including 03 main warehouse. The
...
See more
Located in good location in Di An district in where we can recruit worker easily. This factory is still in good condition, only 01 level with big front yard for parking. The main factory
...
See more
Located in Long Hau Industrial Park, Long An province, only 17km to Hochiminh city center and 2km from Saigon Premium Container Terminal ( SPCT.) This is nice & new factory inside
...
See more